Komatsu PC60-7 carrier roller mini digger undercarriage spare parts
Product Description
Model NO. | PC60-7 | Payment Term |
L/C, T/T, Western Union, and other |
Keyword | Top Roller/Carrier Roller/Upper Roller | Quality | High Quality |
Delivery Time | 3-7 workdays | Production Capacity | 50000 PCS Per Month |
Transport Package | Standard wooden pallet | Warranty | 1~2 Year |
Technological Parameters:
Material 45Mn
Process Forging /Casting
Hardness Depth 5-8mm
Surface Hardness HRC52-58
Features:
Higher carrying capacity
This Komatsu PC60-7 roller is made of high-quality carbon steel and is forged for strength and durability. It is able to withstand various terrain challenges and heavy loads while maintaining optimal performance in demanding operating environments. As a result, the roller has a long service life, typically 1,000 to 3,000 hours.
Improve wear resistance
The top rollers of the excavator are designed with forged steel and are highly wear-resistant to ensure optimal load-bearing capacity. Given that excavators are often used on uneven terrain, the rollers are in constant contact with ground debris and the rubber track system, so they are prone to wear over time. That's why it's crucial to use heavy-duty replacement parts specifically for your Komatsu PC60-7.
Prevent contaminants from penetrating
Our rollers are sealed to protect against environmental contaminants such as dust, debris, and moisture, mitigating potential damage. The design of these rollers focuses on maintaining optimal oil retention to promote smooth operation and long service life.
FAQ
1. Are you a trading company or factory?
We are professional suppliers and brand makers with perfect product development systems, advanced business management workflow, and huge stocks.
2. Can you produce according to the samples or the technical drawing?
We have professional engineers who can produce according to the samples and drawings you provide.
3. Do you accept OEM & ODM?
Yes, we support OEM & ODM.
4. How about your delivery time?
Upon receipt of prepayment, delivery usually takes 3 to 7 days, depending on the products and quantities you order.
5. What are the terms of payment?
L/C, T/T, Western Union, and other payment terms are also negotiable.
6. What should we do if we can't find the product we need in the shop?
You can contact customer service and tell him the products you need and he will provide you with professional service!