Track roller fits Bomag BF800 paver aftermarket undercarriage spare parts
ECHOO has been a supplier to many OEMs of road construction machinery for many years. With design and engineering expertise, extensive research and development, and the use of state-of-the-art technologies, ECHOO develops innovative, reliable and competitive products that meet the highest quality standards
Product Features:
Higher carrying capacity
This Bomag BF800 bottom roller is made of high-quality steel and is forged for strength and durability. It can withstand various terrain challenges and heavy loads while maintaining optimal performance in demanding operating environments. As a result, the roller has a long service life, typically 1,000 to 3,000 hours.
Improve wear resistance
The rollers are designed with forged steel and are highly wear-resistant to ensure optimal load-bearing capacity.
Prevent contaminants from penetrating
Our rollers are sealed to protect against environmental contaminants such as dust, debris, and moisture, mitigating potential damage. The design of these rollers focuses on maintaining optimal oil retention to promote smooth operation and long service life.
Basic Info.
Model No: Bomag BF800
Color: Black
Condition: New
Type: Tracked Asphalt Machinery
Delivery Time: Usually Within 3-7 Days After Payment Receipt
Key attributes
Applicable Industries | Building Material Shops, Machinery Repair Shops, Manufacturing Plant, Farms, Retail, Construction works, Energy & Mining |
Warranty | 1Year |
Size | Follow OEM Strictly |
Keywords | Front Rear Idler / Bottom Roller / Sprocket / Rubber Track |
Packing | Standard Packing |
FAQ
What's your terms of packing?
Generally, for bulk shipments, we will pack the goods on sturdy fumigated wooden pallets. If you have a legally registered patent, we can pack the goods in your branded boxes after getting your official authorization letter.
What's your terms of payment?
You can pay by wire transfer, Western Union, PayPal, or other payment methods we have negotiated on.
What's your terms of delivery?
Fully flexible logistics service to meet your needs.
Regularly, FOB, DDU, and CIF terms are accepted if necessary.
How long would it take to receive the parcel?
Generally, depends on the shipping method. If production is required, we will deliver within our negotiated time after receiving your deposit payment. Time taken depends on the items and quantities you have ordered and also other force majeure.